Annual Capacity 100,000+ Pcs: Qiulai Wood Solid Wood Pallet Production Line Upgrade
Qiulai Wood recently completed a CNC transformation upgrade of its production line. Through equipment updates and process optimization, the annual capacity of solid wood pallets has exceeded 100,000 pieces, and the annual capacity of wooden packaging boxes has exceeded 30,000 sets. The overall delivery cycle has been shortened by about 30% compared to before the upgrade.
Upgrade Details: What Has Changed?
- Cutting Equipment Upgrade: Added CNC cutting equipment, cutting accuracy controlled within ±3mm, raw material utilization rate increased by about 8%
- Drying Kiln Expansion: Drying capacity increased by 50%, wood moisture content can be stably controlled at ≤18%
- Assembly Line Optimization: Re-planned production line layout, reduced material handling distance, single-shift output increased by 40%
- Quality Inspection Enhancement: Added online dimension inspection station, each pallet undergoes three inspections of size, strength, and appearance before leaving the factory
What Are the Actual Benefits for Customers?
Capacity upgrade is not just cold numbers; it brings real changes to customers:
- Shorter Delivery: Standard pallet order delivery time reduced from 7 days to 5 days, batch orders (500+ pieces) delivery time shortened by about 30%
- More Stable Quality: CNC equipment replaces manual cutting, greatly improving product consistency and interchangeability
- Large Batch Capacity: Monthly supply capacity of over 8,000 pieces, meeting the monthly demand of medium-sized manufacturing enterprises
- Volume Discount: Capacity increase leads to lower unit cost, orders of 500+ pieces can enjoy better prices
Capacity Data Overview
| Indicator | Before Upgrade | After Upgrade |
|---|---|---|
| Pallet Annual Capacity | Approx. 70,000 pcs | 100,000+ pcs |
| Packaging Box Annual Capacity | Approx. 20,000 sets | 30,000+ sets |
| Standard Delivery | 7 days | 5 days |
| Cutting Accuracy | ±5mm | ±3mm |
Need Large Volume Procurement?
Capacity has been upgraded. Welcome to visit our factory. Volume pricing for 500+ pieces is more favorable.
Get Quote →